The scope of work includes, but is not limited to, the following tasks: • Approximate Square Footage: 7,500 sq ft (75’ x 100’) • Preparation: If necessary, remove bleachers, all thresholds, and baseboard • Relining the Gym Floor: Repaint lines for basketball, volleyball, pickle ball etc. in compliance with current regulations and specifications. Additional lines may be discussed during your site visit. • Refinishing the Floor: The existing gym floor is a pulastic surface. This proposal should provide an overpour solution (with applicable surface repairs) to restore its appearance and functionality, ensuring a smooth, durable finish suitable for athletic use. • Floor Preparation: Preparation of the existing floor surface, including cleaning, sanding, and repairs of any damaged or worn areas before refinishing. • Safety Considerations: Ensure that all materials used are non-toxic and meet any applicable safety standards. • Permits: Acquiring any necessary permits at the local, state, or federal level for the project. • Finishing: If necessary, install new thresholds, new baseboards, and reinstall bleachers • Timeline: The work must be completed within [insert timeframe, e.g., 2 weeks] from the project start date. Specific start and end dates should be outlined in the proposal. • Post-Project Clean-Up: Removal of any debris and final cleaning of the gymnasium floor. The contractor shall be responsible for obtaining waste containers for removal of all its waste materials, rubbish & packing materials resulting from his/her operations.