The work consists of roadway improvements on CR835 from from 27.8 miles south of US27 to 26.8 miles south of US27 in accordance with the plans that were prepared by Johnson Engineering, Inc. which may include, but are not limited to: Mobilization Maintenance of traffic (MOT) incidental to the construction Surveying (Property line identification and construction staking) Clearing and grubbing, including removal and disposal of all materials generated and disposed of at a proper disposal site Excavation and embankment Shoulder rework Grading work Cold-in-place recycled bituminous paving Milling and resurfacing of existing roadway (alternate) Construction of driveway turnouts Drainage improvements Installation of sod and other erosion control measures as required Installation of signage and pavement markings Utility coordination Testing Permits Secure necessary paperwork to access private property when needed Complete restoration of construction site As-built survey