This project consists of all work associated with the lump sum and unit price bid furnishing all labor, materials, and equipment, and performing all work necessary for the construction of approximately eight thousand two hundred eighty-six (8,286) linear feet of 24-inch wastewater line and nine hundred forty-five (945) linear feet of 36-inch wastewater line, manholes, and all associated appurtenances as detailed in the Construction Plans and Specifications for the Progress Park Sewer Industrial Sewer Outfall. The wastewater line connects to a manhole north of FM 1417 and runs south to connect into an existing 21-inch wastewater line along the east side of Howe Drive. Project shall include all necessary labor, materials, and testing in accordance with the plans and specifications.