I. GENERAL The San Antonio Water System (SAWS) is soliciting bids for the purpose of retaining a Contractor to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines, to adjust manholes, and to renew laterals, on a work order contract basis. Some of the work involved in the projects might require manhole rehabilitation, manhole replacement, cleanout installation, backwater valve installation, concrete flatwork, erosion control, topsoil, sodding, fence relocations, and street patching and resurfacing. The work will be on the wastewater collection system infrastructure throughout SAWS’ service area. All work orders that will be issued under this contract are unspecified at the time of bidding. As this is a work order contract, SAWS does not guarantee, warrant or represent that it will utilize the amount of quantities estimated in the Bid Proposal or that each bid item in this contract will be used on the assigned work orders. The quantities in the Bid Proposal are estimations only. Prior to beginning any work, the Contractor shall carefully plan in close coordination with SAWS to fully develop procedures and standards for the work that will be performed. Employee safety, workmanship standards, and maintaining the integrity of SAWS and City operations with minimal disruption will be the key areas to be addressed prior to beginning work