The project consists of, but is not limited to: Tower High School Titan Express Renovation of the existing Titan Express server including but not limited to reconfiguration of serving lines, masonry wall relocation and infill, removal of; overhead counter doors, man doors, ceilings, floors, finishes etc. with new porcelain ceramic finishes on walls, floors, new overhead counter door, new food service equipment, new plumbing, electrical, with relocation of existing vending machines. Hawthorn Food Service Freezer/Cooler Removal of a freezer/cooler system including removal of the insulated floor/concrete slabs and installation of a new freezer/cooler with new insulated floor slab (Note: additional insulation is required with some additional excavation)