1. Mobilization/ Demobilization, Temporary Facilities, Construction sign, Insurance, Bonds, Taxes, and Similar expenses. LS 1 2. Construction Staking LS 1 3. Geotechnical Testing for quality Control LS 1 4. Waste Management Plan (WMP) LS 1 Site Demolition 5. Remove existing concrete ramp at west side of building (102.50 SF.). LS 1 6. Remove existing concrete landing on main building Entrance (70 SF.) LS 1 7. Remove existing 36" wide concrete apron (530 SF). LS 1 8. Remove existing Book Return Drop Box and concrete slab base. LS 1 Site Improvements 9. New 4" concrete ADA ramp w/#3 Bars @ 18"O.C. E.W., 8" Class II Base compacted to 95% & scarify and compact 24" existing native material comp. to 85% per detail on plans. SF 90 10. New 4' wide / 4" concrete apron with #3 Bars @ 18"O.C. E.W., 8" Class II Base compacted to 95% & scarify and compact 24" existing native material comp. to 85% per detail on plans. SF 708 11. New 4" concrete landing in the main building entrance with #3 Bars @ 18"O.C. E.W., 8" Class II Base compacted to 95% & scarify and compact 24" existing native material comp. to 85% per detail on plans. SF 81 12. New library book return drop box EA 1 13. New ADA directional sign. EA 3 14. New commercial grade, exterior metal window awning with white opal panels. EA 8 15. Exterior paint (existing exterior walls, trims and existing stone venneer). LS 1