This project involves the construction of a 216 square foot shed attached to the existing firehouse building. The scope includes site preparation, foundation work, and construction of walls. Architectural drawings will be provided to guide the installation of materials and structural elements. No electrical, plumbing, siding or roof work is required. 1. Site Preparation a. Clear the designated area for the shed addition. b. Ensure the site is level and properly graded for construction. c. Confirm that the addition will be securely attached to the existing firehouse building. 2. Foundation and Footings a. Install footings according to architectural drawings and local building codes to support the shed structure. b. Pour concrete for the foundation, ensuring the dimensions match the specified size and location (216 sq ft). c. Construct the block wall foundation, using concrete blocks and ensuring proper alignment and stability. d. Pour a 4-inch concrete slab, which will serve as the floor, matching the existing building's slab.