On behalf of the Michigan Department of Corrections (MDOC), the Department of Technology, Management, and Budget (DTMB) is requesting professional design services for the evaluation, design, bidding, and construction administration for the repair, replacement and upgrade the emergency power system and associated electrical infrastructure at the Oaks Correctional Facility. The existing emergency power system currently supports critical systems and facilities and requires expansion to support the whole Oaks Correctional Facility campus. This request is to provide a Phase 100 Study, Phase 300 Schematic Design, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection services. The original generator and switchgear are still in place and nearing the end of their useful life, they may be undersized to meet the facilities current needs. A phase 100 study is required to evaluate the existing medium voltage emergency power equipment including but not limited to the medium voltage switches, transformers, and primary switch gear and provide recommendations for repairs and upgrades to the system to meet current code requirements. Limited drawings are available, the PSC must field verify all conditions.