The principal items of the work of the project include: Installation of NJDOT HMA 9.5M64 Top Course, approximately 15,000 tons, Installation of NJDOT HMA 19M64 Base Course, approximately 1,000 tons; Roadway excavation, 3-inches to 12- inches depth approximately 100 S.Y.; Thermoplastic Line Striping, 6-inch wide, approximately 70,000 L.F.; Milling 0 to 3 inches thick, 101,000 S.Y, Topsoil and Seeding, 4 inches thick, 1,800 S.Y.; Installation of 7-inch Thick Concrete Driveway Aprons or Handicap Ramps, 1,750 S.Y.; 9-inch by 18-inch Concrete Vertical Curb, approximately 3,500 L.F.; Concrete Sidewalk, 4 inches thick, approximately 1,500 S.Y.; Exposed Rounded Aggregate Concrete Sidewalk, 7-inches thick, approximately 160 S.Y.; Bicycle Safe ECO-Grates, approximately 10 each; Repair Inlets and Manholes, 60 Each; NJPDES Storm water Management Phase II replacement curb inlet heads, Type N, approximately 10 each; Bituminous Concrete Driveway or Walkway, 4 inches Thick, approximately 1,500 S.Y.; Reset manholes approximately 100 Each; Installation of 1,000 gallon seepage tank, approximately 5 each; Installation of various sizes of HDPE Storm Drainage Pipe, 3,500 LF; Installation of Stormwater Inlets,10 each; and other related work for a complete project throughout the Village of Ridgewood.