Sitewide security fencing replacement and/or additional fencing installation for Eisenhower Elementary School. THE CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AND NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO THE COMMENCEMENT OF WORK, IF SITE CONDITIONS ARE FOUND TO BE DIFFERENT FROM THE DRAWINGS. PROTECT ALL UTILITY LINES DURING CONSTRUCTION. IF DISCONNECTION IS REQUIRED COORDINATE WITH THE ARCHITECT PRIOR TO WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECONNECTION FOR A FULLY OPERATIONAL SYSTEM. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION WHEN PERFORMING THEIR WORK TO PREVENT DAMAGE TO EXISTING MATERIALS AND SURFACES DURING CONSTRUCTION. ALL DAMAGE TO BE REPAIRED BY THE INDIVIDUAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR WILL CLEAN UP PAINT OVERSPRAY, DRIPS, ETC. CONTRACTOR SHALL, AT ALL TIMES DURING THE COURSE OF THE WORK, KEEP THE CONSTRUCTION AREA, THE OWNER'S PREMISES, INCLUDING STREETS AND OTHER AREAS USED BY THE CONTRACTOR, CLEAN AND FREE FROM ACCUMULATION OF WASTE MATERIALS AND RUBBISH. CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES AS REQUIRED. AT THE COMPLETION OF THE WORK, REMOVE FROM THE BUILDING AND THE PREMISES ALL SURPLUS MATERIALS AND DEBRIS, AND CLEAN THE SITE THOROUGHLY TO THE SATISFACTION OF THE OWNER.