The project primarily consisting of three force main upgrades along North Section Street and South Section Street. North Section Street force main upgrades consist of approximately 2,700 linear feet of 12-inch diameter HDPE force main along North Section Street which will extend from Rosa Avenue within the existing ROW to Bayou Drive. South Section Street force main upgrades consist of approximately 1,900 linear feet of 12-inch diameter PVC force main along Twin Beech Road from Heard Road to South Section Street, 5,100 linear feet of 16-inch diameter PVC force main, and 1,850 linear feet of 16-inch diameter HDPE force main along South Section Street from Twin Beech Road within the existing ROW to South Church Street.