Line No. Description of Work Approx. Quantity UOM Unit Price Total Price 1. Removal and disposal of 5/8" Thick sheetrock, this includes all metal studs 250 SF $ $ 2. Removal and disposal of wood door 36" x 80" plus metal frame 1 LS $ $ 3. Removal and disposal of existing commercial carpet 160 SF $ $ 4. Relocate light switches 2 EA $ $ 5. Removal and disposal of 4" baseboard 40 LF $ $ 6. Supply and Install New Carpet (Mohawk Group 978 Mineralite or approved equal) 500. SF $ $ 7. Supply and install 4" high Baseboard 95 LF $ $ 8. Paint - prime and two top coats of Benjamin Moore, egg-shell paint (color TBD) 1 LS $ $ 9. Install new receptacles with tracking (locations to be determined) 3 EA $ $ 10. Relocate TV to a different wall, this will require adding a new Power supply, CAT 5 cable and HDMI cable with tracking 1 LS $ $ 11. Remove office furniture and store in adjacent space 1 LS $ $ 12. Reinstall office furniture from storage in adjacent space 1 LS $ $