This contract is for work located within the municipal right-of-way and includes the following work to be completed on an annual basis: • Removal of sediment and debris from approximately one-half of the Town’s drainage structures (estimated to be approximately 1,600 structures in Year 1 and another 1,600 structures in Year 2) • Visual inspection of approximately drainage structures upon cleaning in locations to be provided by the Town and completion of associated inspection forms (expected to be approximately 200 structures in Year 1 and another 200 structures in Year 2); The following work will be completed on an as-needed basis where directed by the Town: • Removal of sediment and debris from drainage pipes by use of pressurized, high velocity water jet equipment • CCTV inspection of drainage pipes by use of robotic camera equipment with recording and reporting capability