5.2.2.1 The vendor will need to schedule a site visit with Brian Hall or James Wilson at 229-937-2405 to attain the locations and measurements for replacement. 5.2.2.2 Vendor will provide pricing for the option listed below 5.2.2.2.1 Armstrong – Standard Excelon Imperial Texture (colors will need to match the High School) 5.2.2.2.2 Glue – Henry 695 5.2.2.3 The Contractor will mobilize construction forces necessary to begin the project on a mutually agreed upon start date 5.2.2.3.1 Tentatively Schedule: 5.2.2.3.1.1 Start Date: April 5.2.2.3.1.2 End Date: July 15 5.2.2.3.2 Coordination: Will need to coordinate with Student Days 5.2.2.4 The Contractor will arrange for the following as needed: 5.2.2.4.1 A secure staging area for storing equipment, materials, tools, and supplies, as the Contractor shall have sole liability for said items and 5.2.2.4.2 Access to and provision of utilities as needed for design and construction. 5.2.2.5 The Contractor will furnish and install the new VCT flooring