1 Remove (Only) Full-Depth Asphalt Pavement, Base, and/or Subgrade to Depth of 6 inches, as Shown on Plans. 32,800 SF 2 As Directed/Necessary, Remove Additional 6 inches of Subgrade. For Subgrade Soils Unsuitable for Compaction (i.e. Saturated Clays) 12,000 SF 3 Compact Subgrade Soil and/or Imported Base to 95% per Nuclear Gage. Covers Compaction Only (Imported Base Separate – per Bid Item 18) 34,680 SF 4 Remove (Only) 2-foot Wide Lip (at AC or Landscaped Areas, etc.) for Concrete Formwork. 1,360 LF 5 Sawcut and Remove Encroaching Private Concrete at Property Line. Up to 2-feet beyond Property Line. 325 LF 6 Remove & Replace Existing 8-inch Sidewalk per City Std. Plan SR-07 815 SF 7 Remove & Replace Existing 6-inch Sidewalk per City Std. Plan SR-07 1,200 SF 8 Remove Existing Alley Entrance or Existing Asphalt, and Construct new 8-inch Alley Entrance per City Std. Plan SR-10. Including Lip & Gutter in Front of Alley Entrance 1,670 SF 9 Remove (Only) Existing Cross Gutter in Alley (Sheets 6 & 8 of Plans) 1,880 SF 10 Remove and Replace Existing Curb and Gutter per City Std. Plan SR-01 140 LF