The West Bush Road portion of the project includes rehabilitation of approximately 4,716 LF of roadway. This portion of rehabilitation work includes the addition of 4-inches of gravel base over the existing pavement structure, for part of the length of the project limits, prior to pulverizing and regrading of the entire project limits. A test roll of the base will be required prior to placement of new asphaltic pavement and shoulders. The work on West Bush Road also includes driveway grading, and associated erosion control and restoration as indicated in the Construction Plans and Documents. The Lintner Road portion of the project includes rehabilitation of approximately 1,120 LF of roadway. This portion of rehabilitation work includes the milling of existing pavement and remove existing paved shoulder and asphaltic curb to allow for the reconstruction of the shoulder base to be paved with the addition of Carlson Curb throughout the project limits. The work also includes butt joint milling at driveways; asphaltic flume placement; restoration to ensure drainage and associated erosion control as indicated in the Construction Plans and Documents.