Approximately 1.2 miles of bicycle boulevard improvements along Fulton St, Prince St, Wheeler St, and Woolsey St; Crossing improvements at five key intersections; and Bus stop relocations and upgrades. More specifically, the Work consists of but is not limited to, coordination with utility companies, AC Transit, BART, and nearby businesses and residents; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete pavements; removal of Portland cement concrete curbs, gutters, and sidewalks; construction of new Portland cement concrete sidewalks, curb ramps, medians, and bus stop pads; installation of asphalt concrete pavement and speed tables; installation of new bus stop shelters and benches; adjusting utility boxes and covers to grade; installation of pavement striping and markings; installation of curb paint; installation of signage; installation of traffic circle; installation of pedestrian hybrid beacons (PHBs); and installation of solar-powered Rectangular Rapid Flashing Beacons (RRFBs) and lighting.