Contractor shall replace the aging cooling system equipment for the walk-in fridge and freezer used for food storage at the Allegan County Youth Home Building. Disconnect, remove and dispose of the existing Cooling System equipment and any associated equipment that is no longer needed. 3.2.4 Install the new equipment and reconnect any piping, electricity, temperature control equipment, etc. that is being re-used per contractor’s proposal as accepted by the County to render the cooling systems fully functional. 3.2.5 Conduct a system start-up test to demonstrate and confirm correct installation and proper functioning of the new equipment. Testing shall be conducted with a Facilities Management representative present to verify proper functioning necessary for system for acceptance.