THE CONTRACTOR SHALL TUNNEL AND REPLACE ALL THE SEWAGE SYSTEM FOR THIS RESIDENCE. WHEN THE KITCHEN IS USE FOR LONG PERIODS, THERE IS WATER COMING UP THROUGH THE PORCH. THE CONTRACTOR SHALL INSTALL A NEW 200 AMP ELECTRICAL PANEL. THE OLD ELECTRICAL PANEL SHALL BE REPLACED. ON THE INTERIOR THERE ARE EXPOSED WIRES FROM THE ORIGINAL PANEL. THE CNORACTOR SHALL COVER THE EXPOSED WIRES ON THE INTERIOR AND REPAIR THE MISSING DRYWALL. HE CONTRACOR SHALL REPLACE THE SHOWER SURROUND – THE REPLACE SHOWER CONTROL FAUCET TO SINGLE HANDLE, THE REPLACE SHOWER SPOUT AND SHOWER HEAD, REPLACE THE EXISTING BATHTUB WITH A SHOWER PAN AND REPLACE THE EXISTING TOILET – REPAIR DRYWALL TEXTURE ABOVE SHOWER AND REPLACE CUTOFFS UNDER VANITIES AND TOILET.