Replace Inks Lake Raw pump and motor noted below. Contractor to provide all materials, manpower, and equipment needed. Bidders are strongly encouraged to visit the site. Contractor may provide a contingency amount and revise the quote after inspection for any of the alternates. Contractor may provide a contingency amount and revise the quote after inspection. Quotes below are meant to be turn-key for tear-down and new install, to inspection and delivery. If any items herein are believed to be missing or misleading, the bidder must clarify in the bid or seek prior to bid guidance. Quote 1: Below is the quote description to tune up Pump/motor for raw well #1: 1. Remove old pump and motor and ready it for maintenance. 2. Remove, disassemble, and inspect Well 1 Pump and Motor. 3. Tune-up Motor and pump, replace bearings, seals, and other routine maintenance, and repaint. 4. Prepare Properly Wrap Pump & Motor for storage, deliver to City at a designated location. Motor to be ready for plug-in. 5. Generate PMG repair report. Quote 2: 1. Provide Pump Curve data. Must match existing curve as attached below. 2. Install new 75-hp 3/0 460V Motor and Pump; 3. Install new 2000 GPM at 106’ TDH 10” pump; 4. Repaint discharge head and install; 5. Anchor with rust resistant bolts and seals; 6. New Wiring, clamps, and associated components; 7. Stainless clamps as needed; 8. Install new Pump and Motor, and startup procedures. All components must have 1-year parts and labor warranty.