1. Town Hall Complex – 61 Echo Lake Road • Two Level 2 dual charger locations, single pedestal with two ports each, fed from separate meter locations within the building. • Trench downhill from the parking lot 70 LF • Trench or boring through the parking lot 60 LF • Provide two 1 ¼ PVC conduits underground to car charger locations Estimated 130 LF • run power through 1st floor ceiling to main electrical room Estimated 350 LF • Install new 200-amp sub panel for chargers • Provide wiring and connections for two dual head chargers • Install bollards • EV Pavement Markings and signs 2. Main Street Municipal Parking – 680 Main Street • Two Level 2 dual charger locations, single pedestal with two ports each. • Pull wiring through existing 2” PVC Conduits underground Estimated 150 LF • Provide wiring and connections for two dual head chargers • Install bollards • EV Pavement Markings and signs 3. Depot Street Municipal Parking – 0 Depot Street • One Level 2 dual charger location, single pedestal with two ports. • Trenching and piping foe new dual head charger Estimated 20 LF • Install new 200-amp sub panel for charger • provide wiring and connections for one dual head charger • Install bollards • EV Pavement Markings and signs