Specifications include, but are not limited to: Task 1 - Conceptual Site Model Prepare a CSM for the site incorporating existing information supplemented with additional information including but not limited to: ● Site history and site reconnaissance observations ● Existing site development plans, survey data, utility plans ● 100% Concept Plans for the Center’s farm and community garden spaces, prepared by BASE Landscape Architecture ● Existing soil and groundwater chemical data, boring log and well construction information, and regional and local site hydrogeologic, hydrologic, and geologic information collected at the Site and nearby environmental cleanup cases ● Data from Phase I Environmental Site Assessment (ESA)-type records search The CSM must include at a minimum the following: ● Figures presenting the above listed data utilizing base maps depicting the site configuration (existing and proposed) and surrounding land use presented in plan view and cross-sections.