1. The existing fixture to be removed and the new fixture to be installed with the necessary trim are identified with the link above. The link has a picture of the existing fixture and the name of the replacement fixture. 2. Remove and dispose of the existing fixture off-site. 3. Installation of the new fixture including but not limited to all necessary supply, sanitary, & vent piping from the existing fixture removal. 4. Caulking of all new fixtures and all clean up. 5. Receiving and offloading all fixtures. The supplier will deliver the fixtures to the receiving area for each building. The contractor is to place each fixture in the building at a location designated by the District for storage. 6. The District will provide a location in the building for staging