TASK 1: Keith Evans Road: Intersection of State Route 183 to Intersection of State Route 136. Approximately 8,006 feet. Contractor to specify start date at the preconstruction meeting, which will be approved by the appropriate County staff. Scope: Full depth reclamation approximately 8,006 feet, 24” wide asphalt, with 10-foot lanes and safety shoulders, 10” deep with approved Portland cement mixture, 2” B-Mod Binder and 9.5mm 165 pounds topping. Contractor pricing will include seeding, sewing and dressing all shoulders to 3% no more than 4% fall following final paving. Shoulders shall be a minimum of 2’ from edge of payment as approved by Public Works Director prior to sewing/seeding and straw. TASK 2: Blue Ridge Overlook: Intersection of State Route 53 to the Forsyth County Line. Approximately 7,400 feet –Contractor to specify start date at the preconstruction meeting, which will be approved by the appropriate County staff. Scope: Full depth reclamation approximately 7,400 feet, 24” wide asphalt, with 10-foot lanes and safety shoulders, 10” deep with approved Portland cement mixture, 2” B-Mod Binder and 9.5mm 165 pounds topping. Contractor pricing will include seeding, sewing and dressing all shoulders to 3% no more than 4% fall following final paving. Shoulders shall be a minimum of 2’ from edge of payment as approved by Public Works Director prior to sewing/seeding and straw.