Construction of 1 mile of Mills Civic Parkway from South 91st Street to South Grand Prairie Parkway including 24 acres of Clearing and Grubbing, 28,200 CY of Topsoil Strip, Salvage and Spread, 36,350 CY of Excavation and 76,870 CY of Contractor Supplied Embankment in Place. 4,908 LF of Storm Sewer and 45 Storm Sewer Structures. 993 LF of Subdrain and Subdrain Outlets. 28,380 LF of Conduit and Vaults. 20,411 SY of 10 inch Reinforced PCC Pavement, 532 SY of 7 inch Reinforced PCC Pavement, 713 SY of 7 inch PCC pavement, 5,288 SY of 6 inch Reinforced PCC Shared Use Path, 156 SY of 4 inch sidewalk and 5,131 SY of 6 inch PCC Driveway. Erosion Control, Seeding and Surface Restoration, Pavement Markings, Construction Survey, and other Miscellaneous Construction.