1. Removal of existing foundation and scales. a. Equipment required for removal 2. Lay a new concrete foundation, including two (2) level approaches and two (2) ramps. Foundation should continue from scales to scale house (44 inches). This scope includes, but is not limited to: a. Excavate for continuous foundations; b. Excavate for clean out slab; c. Excavate for ramps and approaches; d. Spoils to be disposed of onsite; e. Backfill edges; f. Continuous foundations are 3,000 psi of straight cement, or as required by the scale manufacturer. This approach assumes existing grade to be at top of approach elevation. 3. Delivery and Installation of Scale Equipment including, but not limited to, the following: a. Installation of Scale by qualified and certified personnel; b. Crane rental; c. Conduit and any miscellaneous equipment/material needed for installation (e.g., anchors); d. Testing and final calibration of equipment.