The milling and HMA surface paving of the entire length of Township Line Road, from Pike Run Road to Willow Road, and from Willow Road to River Road; as well as ADA pedestrian ramp installation at the intersection with Pike Run Road; curb, and storm sewer repairs; drainage inlet casting retrofitting and cleaning, milling, HMA base repairs, HMA surface paving, temporary traffic control, traffic signage, pavement striping, and associated work on Township Line Road and Mont Hill Road. This project is in collaboration with Hillsborough Township. Approximate Major Pay Items Include: HMA Milling, 2” or Less 63,000 SY Hot Mix Asphalt 12.5M64 Surface Course 7,700 TONS Hot Mix Asphalt 25M64 Base Course 1,000 TONS Reset Existing Inlet Casting 32 UNIT Repair Inlet Reconstructed Inlet, Type B, Using Existing Casting Reconstructed Inlet, Type B, Using New Casting Set Inlet Type B, Casting 5 2 5 14 UNIT UNIT UNIT UNIT Curb Piece, Type “N” 29 UNIT Set New Manhole Casting 5 UNIT Concrete Sidewalk, 4” Thick 330 SY Detectable Warning Surface 3 SY 9” x 18” Concrete Vertical Curb Granite Block Curb 670 155 LF LF Traffic Stripes, Thermoplastic, 4" Traffic Stripes, Thermoplastic, 6" 39,070 39,130 LF LF Traffic Stripes, Thermoplastic, 24” RPM, Bi-Directional, Amber Lens 200 51 LF UNIT Regulatory and Warning Signs 411.5 SF