• Remove and dispose of the automatic sliding doors currently in place. • Remove and dispose of the automatic sliding door frames. • Submit the proposed material and door design to the project manager for approval. • Wire or subcontract an electrician to wire the high voltage door openers. • Install 3 swing doors (6 doors total) in place of each set of sliding doors. o The west most door on each set will be a single door with an LCN 4640 door opener. o The center and east doors on each set will be double doors with a removable center mullion. o Each door will be fitted with an EPT-10 for the QEL. o The ADA door on each set will have a Von Duprin 99 crash bars. o The center and east door on each set will have a Von Duprin 99 crash bars. • Install sidelights as needed based upon approved design. • Gather all necessary construction permits. • Meet ADA requirements for swinging entrance doors. • Meet all NFPA standards for swinging entrance doors. • Keep the visual aesthetic of the library. • Provide a point of contact for scheduling construction dates and times. o Dakota County will be using other contractors for parts of this project. • Minimize disruption to the library which will remain open during this work. o Coordination with the project manager and the library will be needed. o Weekend/Overnight/Holiday/Early Morning work is allowed and encouraged. • Ensure all electrical work for the new doors is up to code. • Repair, replace, or otherwise correct deficient materials and workmanship without additional cost to the owner. • Follow all county guidelines for contractors.