• Remove the current closers (return units to the county at 1590 Highway 55, Hastings MN) • Remove the current Von Duprin crash bars (return units to the county at 1590 Highway 55, Hastings MN) • Remove and dispose of the current doors if the current doors cannot be re-used. • Provide the project manager a plan for the new door design. • Disconnect (do not damage) existing low voltage wire and card access equipment on the doors and store onsite for future use. • Install the purchased LCN 9550 openers • Install the purchased aluminum store front doors (if current doors are not being re-used) • Install the EPT-10s into the new doors (if current ones are not being re-used) • Wire the new LCN door openers. An electrical subcontractor may be hired if contracted company is unable to. • Gather all necessary construction permits • Meet ADA requirements for swinging entrance doors. • Meet all NFPA standards for swinging entrance doors. • Keep the existing visual aesthetic. • Provide a point of contract for scheduling construction dates and times. o Dakota County will be using other contractors for parts of this project. • Minimize disruption of the park building which will remain open during the work. o Coordination with the project manager and the park will be needed. o Weekend/Overnight/Holiday/Early Morning works is allowed and encouraged. • Ensure all electrical work for the new doors is up to code. • Repair, replace, or otherwise correct deficient materials and workmanship without additional cost to the owner. • Follow all county guidelines for contractors.