1 203.998 Mobilization LS 1 2 203.100 All materials, labor, equipment, and supervision required for the Gallery #2 (North) RAS Meter Replacements at the NSWWTP per these specifications. EA 2 3 203.300 All materials, labor, equipment, and supervision required for the Sodium Hypochlorite Metering Pump Panel Replacements at the NSWWTP per these specifications. EA 3 4 203.400 All materials, labor, equipment, and supervision required for the Main Lift Station Pump #1 Replacement at the SSWWTP per these specifications. LS 1 5 203.500 All materials, labor, equipment, and supervision required for the Thickener #1 Replacement at the SSWWTP per these specifications. LS 1 6 203.620 All materials, labor, equipment, and supervision required for the Aeration Basin #2 Diffusers and Locking Ring Replacement at the SSWWTP per these specifications. LS 1 7 203.640 All materials, labor, equipment, and supervision required for the WAS Blower and Blower Piping Improvements at the SSWWTP per these specifications. LS 1 8 203.999 Mechanical, Electrical, Plumbing and Unforeseen Circumstances Allowance for various mechanical, electrical, plumbing, and unforeseen work not shown on the construction drawings or specified in the contract documents. EA 100,000 $1.00 $100,000.00