Specifications include, but are not limited to: The work included encompasses approximately 20 miles of city streets, of which about 85% are asphalt roadways and 15% are concrete roadways. The work consists of cold milling approximately 316,930 square yards of bituminous surface – curb to curb at a depth of 5 inches (only can be reduced up to a minimum 3.5 inch depth upon approval by Engineer) in order to provide a 5 inch minimum curb reveal; isolated concrete base replacements, improving concrete sidewalk and ADA ramps; resetting of drainage structure covers; installing HMA speed humps; applying pavement markings and all other related items required to fully complete the work in accordance with the requirements of the contract documents. All work on this contract is to be coordinated in conjunction with the DPW-Street Maintenance Division's HMA resurfacing schedule to ensure that the paving operation is continuous.