The project consists of furnishing all materials, labor, and equipment necessary to upgrade Sewage Pump Station No. 0150, including, but not limited to, providing uninterrupted by-pass pumping capabilities for the pump station peak flow during all construction times and until the new pump station is completely operational and accepted by the Department. The current dry/wet well configuration will be converted into a submersible pump station. Removal top section of existing wetwell, removal of portion of existing force mains; demolition of portion of the existing dry well pump station structure including, but not limited to the following: the existing pumping equipment and appurtenances, piping and fittings, conduits, and all other items deemed necessary to be removed; site preparation, clearing and grubbing as necessary; furnishing and installing new valve vault structure including concrete top slab and access hatch. Furnishing and installing new wet well top slab and hatch. The project scope includes furnishing all labor, material and equipment including, but not limited to, furnishing and installing 6-inch ductile iron pipe, valves and fittings for sewage force main; making a connection to the existing 6-inch force main; perform maintenance of traffic (as required); temporary and permanent paving repairs (as required) Contractor shall maintain the site clear of construction and demolition material and debris, including concrete pavement, miscellaneous concrete, unsuitable and excess backfill material, pipes, valves, pumps, disposal of product water, and discarded electrical and mechanical. Contractor must provide transportation and legal disposal of all discarded material, site preparation, clearing and grubbing as necessary. The project also includes furnishing and install two (2) new submersible pumps Flygt NP3202.095 w/unclog impeller diameter 290 mm, 45 horsepower motors