1 Mobilization/Demobilization (including preliminary construction schedule, bonds, insurance, permits and shall not exceed 5% of the project total cost). 1 LS 2 Traffic Control 1 LS 3 SWPPP 1 LS 4 Construction Surveying 1 LS 5 Clearing and Grubbing 1 LS 6 Unclassified Excavation (Final Quantity) 45 CY 7 Utility Coordination 1 LS 8 6” PCC Type “A” Curb and Gutter per City of Banning Std. No. C-200 350 LF 9 Construct PCC Cross Gutter and Spandrel per City of Banning Std. No. C-211 200 SF 10 Construct PCC ADA Access Ramp Type I per City of Banning Std. No. C-214 9 EA 11 Construct PCC ADA Access Ramp Type II per City of Banning Std. No. C-215 2 EA 12 Construct PCC Driveway Approach per City of Banning Std. No. C-208 1 EA 13 Construct 4” PCC Sidewalk per City of Banning Std. No. C-213 3,000 SF 14 Asphalt Concrete Paving. Match Existing Section 30 TONS 15 Aggregate Base. Match Existing Section 1,050 CY