This project generally consists of demolition of an existing dry polymer system (consisting of dry polymer disperser, mix tank, hold tank, solution feed equipment, control panels, instrumentation, and miscellaneous accessories), associated piping, polyprep water system, and associated equipment pads. Removal/Demolition of 1,000 gal storage tank, hydrogen peroxide metering pump skid and associated piping, and associated utility piping. New work consists of installation of two (2) new emulsion polymer skids, relocation of one (1) existing emulsion polymer skid, equipment pad, polymer feed piping, polymer supply piping, nonpotable water piping, and all associated valving, electrical wiring, and communication wiring to provide complete operable system per the drawings and specifications.