Perform all electrical equipment installation, checkout, and test in a safe manner. Provide the following special safety precautions, as appropriate: 1. Locking and tagging procedures 2. Barricades 3. De-energization and/or isolation of equipment prior to testing 4. Review of procedures with the Engineer and the Owner 5. Erection of warning signs 6. Stationing of guards and watchmen 7. Maintenance of voice communications 8. Personnel orientation E. Do not install electrical equipment in its permanent location until structures are weather-tight or equipment is properly protected from the weather. F. Before energizing any machine, visually inspect for serviceability. Verify that equipment and machines have been properly lubricated and aligned. Verify nameplate for electrical power requirements.