The Contract Representative (COR) may assign additional work through an inspection report as agreed to by the Contractor in a request for services. The contractor will have three days to respond to the request for service unless additional time is allowed by the COR in the request. Mobilization and demobilization rates will be from Kamiah, Idaho. Transport rates are paid one way up to a maximum of three(3) hours per piece of equipment per approved mobilization. Tracking equipment without a transport between job sites that are close enough to allow it will be paid at ½ the operated rate. Road maintenance work will not be permitted when either frozen soil, excessive soil moisture, or inadequate soil moisture prevents satisfactory work completion as determined by the COR.