INSTALLATION OF GAS PIPING FROM EXISTING GAS METER AT THE HOLLIDAY UNIT TO THE NEW TRAIING BUILDLING, DORM BUILDING, AND GUN RANGE TO INCLUDE THE FOLLOWING: * ONE HOT TAP ON 6" LINE WITH 3" TAPPING VALVE AND BORE UNDER ENTRANCE DRIVEWAY FOR 3" POLY LINE. * 1500 LINEAL FEET OF 3" POLY GAS LINE WITH LOCATING TAPE. * 350 LINEAL FEET OF 2" POLY GAS LINE WITH LOCATING TAPE. * 150 LINEAL FEET OF 1.5" POLY GAS LINE WITH LOCATING TAPE. * TWO 2" RISERS WITH IRON BODY STOP AND REGULATOR FROM 10 LBS. TO 14 IN. W.C. AND 2" BODY. * ONE 1.5" RISER WITH IRON BODY STOP AND REGULATOR FROM 10 LBS. TO 14 IN. W.C. AND 1.5" BODY. * ONE 2" BORE UNDER ENTRANCE ROAD FRO LINE SERVING BARRACKS AND GUN RANGE. * NECESSARY FITTINGS AS NEEDED TO MEET THE NEEDS OF THE DESIGN. * TESTING PER CODE.