Project is an addition and renovation to the existing Eastlake High School, originally designed in 1992. The existing building had two full above ground levels and a partial lower level. The addition adds to the highschool's 2011 addition which the school community refers to as its E-wing, located at the NW-corner of the site. The e-wing will have two extensions added to it which will provide twelve (12) new classrooms. Renovation will occur in the existing building at the intersection of the school's C-wing and D-wing and also include a new ground floor connection to the D-wing. Renovated space in the building will include a modernized library, offices, support spaces, classrooms, bathrooms, and an increase in circulation area.