Specifications include, but are not limited to: 18. Prospective contractor shall be responsible for the removal and protection of all gutters, downspouts and the reinstallation of gutters, downspouts. 19. Prospective contractor shall remove all old fascia and drip trim and install new 5/4” x same width LP SmartSide Cedar texture fascial boards (Approx. 441’ lin. Ft.) 20. Prospective contractor shall note that a Sub fascia maybe required for new fascia stability and straightness. 21. Prospective contractor shall replace the ¾”x 1 ½” drip edge trim on the fascia with the new LP SmartSide fascia if the roof has shingles not required if it has a metal roof unless it is needed to make the existing roof trim work. 22. Prospective contractor shall install all the Cedarmill style trim with minimum (2 ½ “finish Galvanized fasteners) And siding installed with minimum length 1 ½ “galvanized HD roofing nail. 23. Prospective contractor shall miter cut all windows and door trim. 24. Prospective contractor shall Install the new 8” LP SmartSide siding with (Approx. 3,951 sq. ft.) of Cedarmill style plank lap siding horizontally over existing siding using 5/4”x 4” trim around all doors, windows and on corners and against soffit eves and rake. 25. Prospective contractor shall trim any electrical breaker boxes and HVAC disconnects and power vents with the Cedarmill style 5/4”x4” and any exterior electrical plugs or fixtures shall be mounted on a piece of 5/16” of adequate size SmartSide panel and shall be trimmed with 5/4”x4” trim so the fixtures will set flat with siding butting up to all trim. And all garage doors trim and jambs to be replaced with LP SmartSide siding and trim. 26. Prospective contractor shall make sure that all of the horizontal siding butts up to the 5/4”x4” trim and has no more than a maximum of a ¼ “gap. 27. All butt joints on siding shall have a 6” in. wide and 1” in. overlap Joint flashing or zip system stretch tape. 28. Prospective contractor shall install all siding and trim to manufacture recommendations. 29. Prospective contractor shall furnish all tools, equipment and labor and caulking to caulk all joints and filling of nail holes and paint all exterior siding and soffit and all doors with 2 coats Behr Premium Plus Ultra primer and Paint satin or equivalent. (Pelican Tan in color Home Depot #SW2036) And fascia and all window, corner, rake and door trim will be painted (Lodge Brown in color Home Depot # SW 3007 must have space between SW and 3007. Prospective contractor shall add insecticide paint additive) 30. Prospective contractor shall be responsible for adhering to paint manufactures guidelines, labeling this includes applying during appropriate temperatures and humidity levels. 31. Prospective contractor shall be responsible for providing any necessary covering and protection of any areas that are to be painted over or around to prevent any drips or over spray or any other flying debris or by-product from work being performed.