A. The Contractor will provide a turn-key installation of a new Arena Bowl Sound Reinforcement System. The Contractor is required to provide the system based on the provided equipment list and drawing package. The Contractor shall provide an engineered stamped drawing set as part of their proposal per Section 5.2. B. The Contractor shall be responsible for the decommissioning of the existing system, securing Owner furnished equipment that will be reused, palletizing and shrink-wrapping of decommissioned equipment. Each pallet will have an inventory with serial numbers attached to pallet and provided to Owner and Consultant. Pallets will be moved to a storage spot in the arena at the Owner’s direction. C. The existing hoists and power at the catwalk hoist level will be used for lifting and suspension of the loudspeaker line array assemblies. D. Should the Owner choose to replace the existing powered loudspeaker system with a passive loudspeaker system, the required quantities of processing and amplification equipment racks will be installed at the designated location on the catwalk level. Contractor will be responsible for all power and electrical distribution from the demarcation point to the new equipment racks as required. Contractor is responsible for providing all secondary power connections and terminations required to power new system components. Contractor is responsible for providing stamped electrical drawings by a licensed electrical engineer in the State of Florida.