Replacement of pump is based on matching the existing specifications and characteristics of existing pump currently in place. Information for the existing pump was pulled from the existing placard. Provide and install (1) New 750 GPM @ 50 PSI, vertical fire pump (4” suction flange, 4” discharge flange) with 30 HP, 3/60/230-460V motor/base/coupling/guard, and 30 HP, 3/60/460V, UL/FM. Installation of the above equipment. Includes and is limited to materials needed to complete installation and make necessary connections. Labor to be performed during normal business hours. Electrical Scope: Disconnect and Reconnect during the transition of the new pump install. To include removal of old equipment and material as well as commissioning of new equipment.