a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on the Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Energy Management: The project consists of: replacing 2 roof areas referred to as roof area's 1 and roof area 2. The existing roof systems will be removed down to structural deck followed by the installation of new insulation, a roof coverboard and new EPDM roofing membrane with a 20-year manufactures warranty. Installation of a new safety rail system at a roof vent will be included followed by a new OSHA approved stairway to access the roof level 2. Installation of new sheet metal components will be included with the installation of the roof system. An approved walkway system will be installed at the completion of the project. Adjacent roof areas will be protected through the course of the roof replacement project. (2) Missouri Athletic Training Complex: The project consists of replacing 5 roof areas referred to as roof area's 9, 13, 14A, 14 B and18. The existing roof systems will be removed down to structural deck followed by the installation of new gypsum substrate, a vapor barrier, insulation, a roof coverboard and new EPDM roofing membrane with a 20-year manufactures warranty. Installation of a new OSHA approved stairway to access an adjacent roof from roof 9. Installation of an OSHA approved ladder from roof section 9 onto roof section 12 will be required. The installation of new sheet metal components will be included with the installation of the roof system. An approved walkway system will be installed at the completion of the project. Adjacent roof areas will be protected through the course of the roof replacement project.