Designed improvements will include 2” milling and asphalt resurfacing, asphalt base repairs (as needed), spot concrete curb and gutter replacement, spot sidewalk widening (8’), stormwater improvements, geometric improvements, signal replacements, ADA ramps, fiber and pavement markings. Geometric improvements at Brougham will include installing northbound and westbound right turn lanes, a pedestrian refuge island on the south and east medians, and a wide sidewalk on the east side. This project may include modifying existing medians at the Greenwood Street intersection and modifying or eliminating the splitter island at the Alden Street intersection. Design services will include survey of existing conditions, utility coordination, acquisition documentation (title reports, surveyed exhibits, easement documents, etc.) needed for any right-of-way or easements, developing construction plans in accordance with Olathe design standards and specifications, cost estimates, assistance with bidding of projects for construction and assistance as needed throughout construction.