1. Assisting the District in sequencing, delivery, installation and set up, inventory, and acceptance for the school classroom furnishings. The Architect will provide design and procurement services for the majority of the furnishings, while some furnishings and equipment will be provided by the Owner or relocated from the existing schools. 2. Assist the Owner to coordinate the technology, theater equipment, and AV Equipment procurement, delivery, and installation. Also assist the Owner to confirm locations and devices provided through procurement meet the Owner’s specifications. The Owner has engaged a Theater Consultant to provide design and specifications for the majority of the theater and other AV equipment, but have yet to finalize and procure the equipment. 3. Assisting the District in sequencing, delivery, installation and set up, inventory, and acceptance for the kitchen equipment not specified by the Architect/Kitchen Designer. The Architect has engaged a Kitchen Designer who designed and specified the kitchen equipment (as is typical in school construction projects). The Owner will be responsible to further equip the kitchen with items including but not limited to pots, pans, cutlery, spices, food containers, maintenance equipment, wares, etc. The Project Coordinator should assist in this effort. 4. Lead the effort to consolidate and relocate the library materials from the two school buildings and properly set them up and inventory the books. 5. Assist the Owner with the moving of staff curriculum materials and classroom support items to ensure the school may open successfully in August 2027.