Sidewalk construction on South Davis Drive (approximately 1,710 feet) and Orchard Way (approximately 1,160 feet). 1. Installation of sidewalks to include ADA compliant ramps at the following locations: - S. Davis Drive (East Side) from Randolph Avenue to Clay Street – Approximately 1,710 feet - Orchard Way (West Side) from Greenway Drive to dead end – Approximately 1,160 feet 2. Sidewalks at each location should be 4 feet in width. 3. Sidewalks and ramps must conform to all specifications and regulations described in Exhibit B: Technical Specifications. 4. Removal and disposal of any unnecessary existing sidewalk, as needed. 5. Utility locates completed prior to any construction or concrete removal. 6. Removal of all equipment and debris from worksite at the conclusion of each workday. 7. Protection of all surfaces including those not in the scope of work from construction debris or damage. The contractor will be responsible for any damage to property due to construction. 8. All work shall be substantially completed within 60 calendar days of Purchase Order issuance.