The specific scope of work for each job shall be determined in advance and in writing between 791COOP Participants and Awarded contractor. It is okay if the 791COOP participant provides a general scope, but the awarded contractor should provide a written scope of work to the 791COOP participant as part of the proposal. Once the scope of the job is agreed to, the 791COOP participant will issue a PO with the estimate referenced as an attachment along with the bond and any other special provisions agreed to for the 791COOP participant. If special terms and conditions other than those covered within this solicitation and awarded contracts are required, they will be attached to the PO and shall take precedence over those in the base 791COOP contract Pricing will be evaluated based upon completion of EXHIBIT A. JOC PRICING SHEET. RS Means (Division 1 – General Conditions) RS Means (Division 2 – Existing Conditions) RS Means (Division 3 – Concrete) RS Means (Division 5 – Metals) RS Means (Division 6 – Woods and Plastics) RS Means (Division 9 – Finishes) RS Means (Division 11 – Equipment) RS Means (Division 12 – Furnishings) RS Means (Division 13 - Special Construction) RS Means (Division 26 - Electrical) RS Means (Division 31 - Earthwork) RS Means (Division 32 - Exterior Improvements) RS Means (All Other Divisions)