In an effort to make certain improvements necessary for compliance with the Americans with Disabilities Act (“ADA”) to the lower multi-use field of the RHAM High/Middle School, Reg. 8 has enlisted Loureiro Engineering Associates Inc.’s assistance to create specifications and drawings (Exhibits F and G), outlining the required improvements. The work generally consists of temporary site controls; selective demolition; earthwork; construction of a segmental concrete block retaining wall, gravel driveway, bituminous path and accessible parking; and cast-in-place concrete flatwork for pads and sidewalks; site restoration; and all incidental work items required to complete the work as shown on the Drawings and as called for in the specifications (collectively the “Project”). For a detailed outline of the Scope of Work, consult Exhibit F and Exhibit G. The total estimated construction costs, with contingency, is $ 250,000.00.