Schedule A: True North 400 Bus Shelter Program: Holcomb Bridge Road at Dogwood Road (Will adhere to City of Roswell specifications); This project proposes the installation of a bus shelter and includes all associated sitework, grading, hardscape, and landscape installations. Schedule B: Windward Parkway at North Point Parkway Intersection Improvements (Will adhere to City of Alpharetta specifications); This project proposes improvements to the existing traffic signal and signal timing as well as expansion of the concrete median across the entire existing turn lane and incorporating landscaping within the median. This project will also include minor utility adjustments along with roadway milling, pavement overlaying, and restriping. Schedule C: Lakeview Parkway Sidewalk Improvement (Will adhere to City of Alpharetta specifications); This project proposes to replace approximately 225 linear feet of existing 5-foot sidewalk with 10-foot sidewalk to connect the existing multi-use trail along Morrison Parkway to the trail network within the GA 400 Center along Lakeview Parkway, This project will also include minor water utility adjustments along with roadway milling, full-depth widening, turn-lane extension, pavement overlaying and restriping.