All work should be conducted during dry weather with no forecast of precipitation during the time needed for products to dry and cure. ● All seams and areas where new materials will be installed shall be properly prepped with products specified by manufacturer to work in conjunction with patching. Gutter seams should be properly prepared and cleaned of all pre-existing materials, dirt, and debris; necessary for proper adhesion of new products. ● Seams need to be sealed with fabric reinforcement and then need to be covered with a liquid coating. NOTE: Type of materials and brand must be specified by Bidder in their response. ● All materials and procedures should conform to the manufacturers specifications. ● Contractors shall provide a detailed process with their submitted bid. ● The District requires that an OSHA JHA (job hazard analysis) be submitted prior to any work commencing. ● Awarded contractor is responsible for cordoning off areas in which work will be conducted. ● Awarded contractor shall maintain a clean and safe environment throughout the project. Daily clean up and storage of equipment and materials is expected.