Install up to 25 water services per release o To be installed continuously until each release is completed o Each release shall be completed within 30 days of initial release o Releases shall be made monthly on the same calendar day of each month o Conduct a pre-installation meeting prior to work commencing at the beginning of each release o No work shall be started without a CCU employee onsite o All work to be scheduled with the Construction Field Supervisor three (3) days prior to commencement o The Construction Field Supervisor must be informed if work is to be cancelled for any reason o The Contractor must provide a working pump for dewatering ground water or repairing of a broken water main caused by the contractor NOTE: There will be no connections made to water mains 60” deep or lower • Typical installation of each short service water connections to include, but not limited to: o Epoxy or nylon coated stainless steel double strap service saddle x 1-inch Includes tapping of water main o 1-inch Corporation Stop MIPT x 1-inch Insta-Tite o 3M water marker ball Attached to pipe with cinch-ties/tie-wraps o 1-inch Blue poly tubing o 1-inch Insta-Tite U-Branch x ¾-inch MIPT o ¾-inch FIPT x ¾-inch MTR curb stop Each curb stop to have a bullet lock installed on all non-metered sides of the U-Branch o 1 hole x 2 hole fiberglass meter box o Blue fiberglass meter box lid • Typical installation of each long service water connections to include, but not limited to: o Epoxy or nylon coated stainless steel double strap service saddle x 1-inch Includes tapping of water main o 1-inch Corporation Stop MIPT x 1-inch Insta-Tite o 3M water marker ball Attached to pipe with cinch-ties/tie-wraps o 1-inch Blue poly tubing o 1-inch Insta-Tite U-Branch x ¾-inch MIPT o ¾-inch FIPT x ¾-inch MTR curb stop Each curb stop to have a bullet lock installed on all non-metered sides of the U-Branch o 1 ½-inch PVC SCH40 Casing o 1 hole x 2 hole fiberglass meter box o Blue fiberglass meter box lid o Directional boring and casing